Are you ready….

Now, and after 30 years in the offshore and marine business, Zamil Offshore Services became the largest Offshore Marine services company in the Middle East. From its inception Mr. Zamil Al-Zamil was appointed president of the company. Upon the establishment of Zamil Offshore Services, it started in the business by acquiring new and used offshore vessels, chartered them to Saudi ARAMCO, operated them and succeeded in making the necessary maintenance, repair, and conversion for its entire fleet. Gradually it succeeded in expanding their fleet in 30 years to 55 vessels, and now most of the vessels are in long term charter agreement with Saudi Aramco. The company has been change to closed stock holding company, Mr. Zamil Al Zamil is the chairman and Mr.

Mercury Mirage Plus Vs. Mercury Offshore Props

Hello, my name is Michael Choron. I am your captain, host and deckhand. I am a life-long resident of the Gulf Coast with over 25 years of experience in the fishing industry. I have been in the fishing charter business since and the highlight of my job is watching families spend quality time together. Since I have two young children of my own, I possess a unique skill that sets me apart from the rest. While aboard, I am very sincere and safety-oriented.

Aug 25,  · At offshore Sabah, KBB location,Hook-Up and Commissioning.

The Arcticaborg in operation. Discovered in July , Kashagan has been described as the largest field found in the past 30 years, the largest outside of the Middle East, with a projected output close to that of the Ghawar field in Saudi Arabia. The field is being developed by a group of partners including Shell The funds will be handed over between and Kashagan oil field production and gas leakages First production from the field was achieved in September The production had to be, however, halted for few weeks as gas leaks were detected from a pipeline connecting the field to the onshore processing facility.

Sulphide stress corrosion was identified as the cause of the leaks. The consortium planned to produce , bpd of oil from Kashagan by the end of , which was expected to rise up to , bpd upon completion of the second phase, but production has since been suspended due to the replacement of pipeline. The reef is about 75km long and 35km across, with a narrow neck joining two broader platforms Kashagan East and Kashagan West.

The top of the reservoir is 4. The seal is middle Permian shale and late Permian salt. The reservoir consists of limestone with low porosities and permeability. The field is heavily overpressured, which presented a significant drilling challenge. The Caspian Sea is 30m below sea level.

Offshore jobs in Scotland

Other documents used in the development of the CSS configuration are as follows: The usual appearance of them is to have the cause on the left hand side with the effect at the top with a ‘X’ matrix. Sometimes logic symbols are included which make the operator’s engineering design requirements unambiguous. Whilst this is an excellent approach it is rather costly, thus it is infrequently used.

Cause and Effect – Some projects categorize cause and effects as part of process document and some other projects consider them an instrument deliverable.

• Support to Offshore Installation, review of structures design, installation aids, installation methodology. • FPU equipment readiness for hook-up, CTR management

The Bouri field is located offshore the Libyan coast and has been producing since Image courtesy of Cipiota. The Bouri field lies in water depths between m and m, offshore the Libyan coast, in the Mediterranean Sea. The field is located in the block NC , which contains one oil reservoir and two gas reservoirs. Production from the field started in through two production platforms and Sloug floating storage and offloading FSO vessel.

Consisting of 38 wells, the field was developed using two platforms, a central processing platform DP4 and a satellite platform DP3 to produce , bopd of crude oil for export. The two platforms are located four miles 6. A floating hose is used to ship the processed oil to a shuttle tanker for export.

Bouri Field, Mediterranean Sea

This boat is practically new and only has 5 hours of total use! This Big Cat is the definition of the performance boat! It is a masterful blend of superior technology and the comfort and roominess that only a Force Offshore can deliver. This tunnel hull design delivers the smoothest possible ride in almost any water conditions.

This boat is outfitted with a Horsepower Performance Racing Engine. This engine is matched up with a Premium Arneson Racing Drive featuring dual 4 blade Stainless steel ‘Elephant Ears’ prop in excellent condition.

FSO tow and installation complete for Culzean field, offshore UK 9/19/ LYNGBY — Last week, hook up of the Ailsa Floating Storage and Offloading unit (FSO) was successfully completed.

Kvaerner and Aker Solutions will work integrated with Statoil and assist in all parts of the project execution. The scope will primarily consist of planning, management and hook-up of the seven platform modules, scheduled to arrive in Norway in second quarter Kvaerner will formally operate as a subcontractor to Aker Solutions. The contract has an estimated value for Kvaerner of approximately NOK million. This is yet another confirmation of our experience and expertise within offshore hook-up and completion,” says Terje Johansen, responsible for hook-up and completion in Kvaerner.

The project will commence in February and will in the preparation phase employ around people. This work will be carried out in Stavanger. In the execution phase, starting summer , up to 1 persons could be involved in the project. The contract also includes options for offshore hook-up of the process and living quarter platforms for Johan Sverdrup. These platforms are scheduled for field installation in

Kashagan Offshore Oil Field Project

A couple of party boats still fished the canyons. Swordfish were hooked at the canyons. Few trips boated for them recently in windy weather.

29′ Force Offshore Cat: Force Offshore with new Imco extended boxes with Teague Platinum shaft XR drives, labbed props, new quad steering, new huge JL Audio stereo system, new diamond stitch interior, new carpet, Twin Ilmor ‘s just serviced ready for new owner.

Partnering with the best towing contractors is a prerequisite, but high-level coordination, detailed planning and seamless execution are also required to ensure that assets arrive at their destination safely, securely and on schedule. In doing so we manage the coordination of up to six separate vessels. All eyes are on the hook-up team, as the other commissioning activities cannot commence until hook-up is complete.

When the pressure is on, you must have a team in place you can absolutely rely on. There are a host of potential, critical pitfalls and few contractors with real experience in the field. DSI are the buoy tow and hook-up professionals. Submerged buoy Submerged buoy installation is not for the faint of heart, or inexperienced. Positioned under the water, yet at shallow depths, with fixed length moorings and complex subsea mooring connections, specialist expertise is essential.

We have extensive experience of all aspects of operations, from pre-installing installation aids prior to buoy float-out, to securing mooring lines with absolute accuracy, and completing subsea connections. We are experts in positioning vessels with adequate redundancy in case of poor weather, successfully coordinating activities between multiple vessels and hook-up vessels, and deploying personnel onto the buoy when necessary.

Aker Solutions in Johan Sverdrup hook-up

Usually Ships in 1 to 2 Days Our Price: Available in the colors listed. Packed 10 squid per bag. Perfect for rigging spreader bars Also effective as a “Chugger” over a ballyhoo, when rigged in tandum as a Daisy Chain, as a “Smokin” Tuna Teaser or Trolled with a Strip Bait Affordability, durability, and quality. This is What Tsunami put into this gimbal fighting belt. No more back strain or fatigue when battling big fish.

Level 3A, Menara RKT, No. 36, Jalan Raja Abdullah Off Jalan Sultan Ismail, Kuala Lumpur. Tel: + – / + – | Fax: + –

Only on very rare occasions, when the water gets extremely cold does the bite slow. The shot to Stellwagen is much easier and is less than 20 miles from Boston Harbor. When spawning in the late Fall on Georges Bank, the cod can be found a little closer and shallower on some of the many wrecks that litter the bottom. The combination of strong tidal currents and wind can sometimes create some daunting seas. In early winter through late winter there can be a very respectable run of fish that can be reached from Rhode Island and Montauk, Long Island.

What to bring For most anglers, open boats and charters are the best way to experience this fishery. The right piece of bottom can make all the difference. Most captains carefully guard their most productive spots. Rather than take a long ride, burn a lot of fuel, and spend the day trying to find a good piece of bottom, it is both easier and usually less expensive to go on an open boat or book a charter.

These captains spend a lot of time in this area and have a very good handle on where the fish are at certain times during the season. Their knowledge of the tides and currents is invaluable.

Welcome to Captain Hook’s Marina!

These designs can either resist very thick sheet ice or can routinely disconnect and move out of the way of icebergs. We are currently using this model to develop a new shallow water platform design suitable for the North Caspian and other ice-prone areas near shore. Barge Mounted Systems and Complex Processes Barge mounted platforms can accommodate large complex topside systems.

Similar barge mounted platforms can be grounded in shallow water near-shore locations such as estuaries and delta areas. This is also a potential solution for remote areas such as the Arctic.

Nov 20,  · How to Hook Up a Comcast Cable Box. This wikiHow teaches you how to connect a Comcast cable box to your TV. Make sure that you have cable installed. If a Comcast representative didn’t come to your house to install cable, you’ll need to Views: K.

The crane hook passed load testing up to 80 mt, along with all associated quality control checks according to strict criteria. This component would typically be manufactured using casting or forging. In using WAAM, Huisman states that it significantly reduced the delivery time and cost of producing this large component. The company also stated that the AM hook was produced to a more consistent level of quality than cast or forged hooks. In using WAAM, Huisman states that it significantly reduced the delivery time and cost of producing this large component Courtesy Huisman Equipment Huisman employs Additive Manufacturing to produce mid-size to large components with high-grade tensile steel, including a large four-prong hook, with an own printed weight close to 1, kg.

The process allows the manufacture of simple or complex shapes, offers short delivery times and can include local alternative material properties to improve wear and corrosion resistance, for example. The successful WAAM test results will enable Huisman to extend its range of reliable components that were either physically impossible or commercially unfeasible by other methods.

The company reportedly aims to improve the WAAM process further by reducing the cost price for the technique and increasing its manufacturing capability to include the production of items weighing up to 2, kg.

Offshore aquaculture

Forecast as of 9: Seas 3 to 4 ft. Swell mainly from the E with a dominant period of 10 seconds.

Hook’d Up Services, LLC was started in March by Hank Hooker of New Braunfels, Texas. We offer a full range of pipeline services throughout the United States. Hank brings over ten years of experience in the pipeline industry to the company.

As basic as bottom fishing may appear, the quality of the rig you drop into the depths has everything to do with your success. Flawless knots, quality terminal tackle, and premium leader material maximize your chances of boating big bottom fish, while anything less will leave you headed home empty handed. When you set out to purchase rigging materials for bottom fishing — focus on securing the best quality hooks, leaders, and swivels first. When it comes to hooks, wide gap 2X strong circle hooks are the way to go.

When it comes to leader material, spare no expense and invest in high quality flourocarbon. In addition to being more durable than monofilament, flourocarbon is also stiff — which translates to fewer tangles while dropping baits down. Pick up spools of Yo-Zuri pink in 40, 60, and 80lb test. Definitely keep a few spools of monofilament leader in stock as well — 20lb, 40lb, 50lb, and 60lb.

When it comes to swivels — spare no expense. Swivels are the heart of the rig and often the component which gives way under extreme pressure. Purchase high quality swivels — barrel, clasp, and three way in 60lb, 80lb and lb class. You should keep a stock of bank sinkers in the 12, 16, 20, and 24 oz variety. Keep one or two 32 oz bank sinkers as well with maybe one or two stick leads as a backup.

Offshore Platform Installation- Jacket Installation and Topside Installation